Lower Seletar Waterworks receives and treats 60M gallon of water per day from the existing Lower Seletar Reservoir and will deliver drinking water to PUB’s Island Service Reservoir in a 7.2-hectare plot of land. A new Raw Water Pumping Station is constructed adjacent to an existing RWPS at Lower Seletar Reservoir.
Scope
- AWARDED 11 BUILDING
- FULL MECHANICAL & ELECTRICAL CONTRACT
- ALL EQUIPMENT INSTALLATION WHICH INCLUDES 100 TONS FILTER PRESS BY ANDRITZ
- FABRICATION OF ALL PIPE RACK & STRUCTURE
- MECHANICAL PIPE – STAINLESS STEEL, MILD STEEL CEMENT LINING, DUCTILE IRON CEMENT LINING, PVC, MILD STEEL AND ALL ITS PIPES SUPPORTS
- ASSIST IN FULL TESTING & COMISSIONING